Pharma Capsules - Pharmaceutical Technology

Latest Issue
PharmTech

Latest Issue
PharmTech Europe

Pharma Capsules
Brief pharmaceutical news items for November 2008.

Pharmaceutical Technology
Volume 32, Issue 11, pp. 158

Expansions

Catalent Opens UK Warehouse

Catalent Pharma Solutions (Somerset, NJ) opened a new temperature-controlled warehouse in Bolton, Lancashire, England, to meet increased customer demand for clinical-supply services, especially cold-chain storage and distribution. The new warehouse is a purpose-built extension of the company's existing facility in Bolton.

The new storage site is fully operational. It contains 11,800 ft2 of space, 2000 controlled ambient-storage locations, and a 320-pallet refrigerator. Catalent plans to constantly enhance its capability to support global programs requiring cold-chain storage and distribution of clinical materials.

Patheon Completes Intermediate-Scale Processing Facility

Patheon (Mississauga, ON, Canada), a global provider of drug-development and manufacturing services to the international pharmaceutical industry, completed a new intermediate-scale processing suite (ISPS), located at its Cincinnati, Ohio, facility. The ISPS provides increased manufacturing capacity and complements Patheon's development and commercial-scale facilities.

The ISPS's equipment includes an intermediate-scale high-shear granulator and a fluid-bed dryer with solvent and high-potency compound handling capabilities. The new suite will allow the production of batch sizes ranging from 35 to 115 kg and enable Patheon to meet the development, clinical, registration, scale-up, validation, and commercial requirements of its customers. In addition, the ISPS will provide flexibility in scheduling experiments on a large scale and use less active pharmaceutical ingredient compared with commercial scale processing.

Meissner Purchases Manufacturing Plant

Meissner Filtration Products (Camarillo, CA) closed escrow on a 172,077-ft2 facility in Camarillo, that is ideally suited for use as the company's corporate headquarters. Meissner will lease the building to its current occupant for two and a half years before consolidating two locations into the new facility.

"By making the acquisition at this time, we are assured that we can sustain growth without experiencing space limitations," stated Christopher Meissner, the company's chief executive officer, in a press release. "With this acquisition, we have solved our need not only for additional manufacturing space, but also for laboratory space. Furthermore, with 68,000 ft2 of office space, the new facility is well suited to meet our requirements for research and development, engineering, quality, and training."

Azopharma Expands Cyanta Facility

Azopharma (Hollywood, FL) completed the expansion of its Cyanta Analytical Laboratories facility in Maryland Heights, Missouri. The expansion includes 10,000 ft2 of additional laboratory and office space and nearly doubles the operating space of the inhalation-services facility. The new space is contiguous with the current Cyanta facility, which the company occupied in December 2007.

A recent audit by the US Food and Drug Administration resulted in no Warning Letters or observations, and Cyanta's quality systems and expanded laboratory space are ready to support clients' new programs. The new facility includes instrumentation specific to the development of inhalation devices and pharmaceutical products.

ABC Labs Opens Pharmaceutical Facility

Analytical Bio-Chemistry (ABC) Laboratories (Columbia, MO) officially inaugurated its new 90,000-ft2 pharmaceutical development facility with a ribbon-cutting ceremony and open house. The event marked the completion of a carefully orchestrated transition of the company's drug metabolism and pharmacokinetics, bioanalytical, and current good manufacturing practice analytical operations to the new facility, as well as the company's 40th anniversary. The new facility, located at the University of Missouri's Discovery Ridge Research Park, more than doubles the company's previous capacity and will accommodate projected growth through 2012.

The company will continue operating its chemical services and synthesis operations at its original campus east of Columbia. The expansion at Discovery Ridge frees up space needed for those business areas to grow. ABC Laboratories plans to renovate existing structures in 2009 to optimize operational efficiency.


ADVERTISEMENT

blog comments powered by Disqus
LCGC E-mail Newsletters

Subscribe: Click to learn more about the newsletter
| Weekly
| Monthly
|Monthly
| Weekly

Survey
Which of the following business challenge poses the greatest threat to your company?
Building a sustainable pipeline of products
Attracting a skilled workforce
Obtaining/maintaining adequate financing
Regulatory compliance
Building a sustainable pipeline of products
26%
Attracting a skilled workforce
29%
Obtaining/maintaining adequate financing
14%
Regulatory compliance
31%
View Results
Eric Langer Outsourcing Outlook Eric LangerBiopharma Outsourcing Activities Update
Cynthia Challener, PhD Ingredients Insider Cynthia Challener, PhDAppropriate Process Design Critical for Commercial Manufacture of Highly Potent APIs
Jill Wechsler Regulatory Watch Jill Wechsler FDA and Manufacturers Seek a More Secure Drug Supply Chain
Sean Milmo European Regulatory WatchSean MilmoQuality by Design?Bridging the Gap between Concept and Implementation
Report: Pfizer Makes $101 Billion Offer to AstraZeneca
Medicare Payment Data Raises Questions About Drug Costs
FDA Wants You!
A New Strategy to Tackle Antibiotic Resistance
Drug-Diagnostic Development Stymied by Payer Concerns
Source: Pharmaceutical Technology,
Click here