What Is Hindering The Uptake Of Biosimilars? - Pharmaceutical Technology

Latest Issue
PharmTech

Latest Issue
PharmTech Europe

What Is Hindering The Uptake Of Biosimilars?


Pharmaceutical Technology Europe
Volume 22, Issue 8

The full version of this biosimilars feature can be read in the August issue of our digital magazine: http://www.pharmtech.com/ptedigital0810


Huub Schellekens
The biggest differences between the development of a biosimilar and a generic medicine lie primarily in the preclinical and clinical stages. Unlike with classical generics, in order to obtain marketing authorisation, biosimilars manufacturers must submit animal data and data on efficacy in patients. The exact requirements depend on the product. For epoetins, for example, two clinical efficacy trials are expected, but for G-CSF induction of leukocytes in a volunteer study is considered adequate. Another important part of the biosimilar submission process is the similarity exercise, i.e. where the biosimilar must prove to be sufficiently similar to the original product in terms of quality, safety and efficacy.

Define similar

The European regulations from the European Medicines Agency (EMA) have not set any specifications concerning the differences that are acceptable between the biosimilar and the original product. Differences will always be found, for instance in the glycosylation between two epoetin products, but if the clinical data show that these differences are not clinically important, the EMA will accept them.

In practice biosimilar manufacturers have analysed the original product for a number of years to get data on the batch-to-batch variation and their specifications are set based on the quality of the original. The monograph included within the European Pharmacopeia is another source of specifications and quality attributes.

In Utrecht University we are currently analysing the quality of biosimilar epoetins and we find these comparable and sometimes even higher in quality than the originals.

Slow uptake

In general, clinicians prefer not to switch patients from one biologic to another. This is reinforced by statements by the EMA, which state that a biosimilar authorisation does not imply that the product is exchangeable with the original as is the case with generics. In addition there are concerns about the long-term safety of biosimilars, because they have only recently been introduced; clinicians want to wait for a couple of years until the safety is established. As such, all biosimilar companies are required by the EMA to study long-term safety post-marketing. Further, to make the biosimilar treatment traceable, substitution without the consent of the treating physician is discouraged and even made illegal in some European countries.

Although there is no specific pharmacovigilance programme in place for biosimilars in Europe, as for any other drug, biosimilars manufacturers are required to submit a risk management programme, which includes a comprehensive pharmacovigilance programme. Although the biosimilar companies run these programmes, the EMA first evaluates the capacity of the companies to comply with pharmacovigilance demands.

Finally, although the key selling point of a biosimilar is its low price, this may not be deemed sufficiently lower than the originator in order to stimulate its use.

Huub Schellekens is Professor in the Department of Pharmaceutical Sciences and Innovation Studies at Utrecht University, The Netherlands.

ADVERTISEMENT

blog comments powered by Disqus
LCGC E-mail Newsletters

Subscribe: Click to learn more about the newsletter
| Weekly
| Monthly
|Monthly
| Weekly

Survey
What is the single greatest threat to maintaining manufacturing processes at your facility?
Quality issues
Facility/environment problems
Process development problems
Production equipment downtime
Raw material supply problems
Regulatory restrictions
Business decisions to limit production
Quality issues
44%
Facility/environment problems
0%
Process development problems
11%
Production equipment downtime
11%
Raw material supply problems
11%
Regulatory restrictions
0%
Business decisions to limit production
22%
View Results
UPCOMING CONFERENCES

Programs for Investigational and Pre-Launch Drugs
Philadelphia, PA
July 17-18, 2013
Request Brochure

Strategic Pipeline Planning & Portfolio Valuation
Philadelphia, PA
August 13-14, 2013
Request Brochure

MES 2013 - Forum on Manufacturing Execution Systems
Philadelphia, PA
August 14-15, 2013
Request Brochure

Mobile Innovation for the Life Sciences Industry
Philadelphia, PA
August 20-21, 2013
Request Brochure

See All Conferences >>

Eric Langer Outsourcing Outlook Eric LangerOutsourcing's Modest Role as a Cost-Containment Strategy
Patricia Van Arnum Ingredients Insider Patricia Van ArnumIntellectual Property Battles in Solid-State Chemistry
Nathan Jessop Industry Insider Nathan Jessop Campaign Against Counterfeit Drugs Continues
Lynn Torbeck Statistical Solutions Lynn D. TorbeckCompositing Samples and the Risk to Product Quality
 More
Patent Settlements Become More Risky
Praise and Perils for Biotechnology Patent Policy
Risk-Mitigation Strategies in Drug Manufacturing for Emerging Markets
Quality Focus: Ensuring Raw Material Transparency
Advertising of Prescription Drugs  Keeping it Honest and Balanced
Source: Pharmaceutical Technology Europe,
Click here