Case Studies in Pharmaceutical Project Management
A technical forum featuring Catalent Pharma Solutions, SAFC, and Neuland Laboratories.


Pharmaceutical Technology
Volume 36, Issue 2, pp. s14-s22

Technology transfer. The technology-transfer process was initiated by creating a comparability document that detailed every aspect of the manufacturing process. The process used in the European manufacture was listed step by step in the document with Catalent's suggestions and capabilities side by side. A final agreement for each step was included and served as the approved path forward. The specifications for in-process testing at each stage of the formulation as well as finished-product specifications were included in the document. The formulation process required bulk sterilization of a multicomponent polymer base with a relatively tight viscosity range. Two APIs were combined in a second part of the formulation and transferred to the polymer solution by sterile filtration. Of course, the entire formulation skid required steam sterilization of the product path through the BFS machine and maintenance of the sterile boundaries for the product during the entire filling process. Electronic documentation of all temperatures, times, and controls for each process step also were also required.

Communication. The NPD project manager and the strategic account manager facilitated weekly calls with the original equipment manufacturers of the formulation and BFS equipment as well as construction meetings during that phase of the project. Weekly calls were held with the customer representatives who were in liaison with the project team. A standard methodology was used to ensure that the meetings had a structured agenda and minutes issued for review in a timely fashion. A joint Project Steering Committee was formed, which was comprised of customer senior leadership members, Woodstock site leadership members, and Catalent business-development members.


Figure 1 (Catalent): A blow/fill/seal suite at Catalent’s Woodstock, Illinois, facility. (FIGURES 1-3 (CATALENT) ARE COURTESY OF THE AUTHOR)
Project Steering Committee meetings were held every three weeks during the course of the project. A formal presentation was made at each meeting to discuss progress toward major milestones in the project plan. Strategic decisions were discussed and developed through the Project Steering Committee meetings, and the decisions were ultimately made by the joint project team. This management design reduced the cycle time for critical decision-making between the customer and Catalent.

An example of such decision making was approval of a change to the SAT/FAT strategy originally planned for the formulation skid. The formulation skid is a fully automated two-tank system with over 100 control and process valves that are actuated in approximately 20 sequences. When the software development lagged behind the construction of the hardware, the opportunity arose to do a mechanical FAT, ship the formulation skid to the Woodstock site, complete the installation and mechanical troubleshooting of the skid and wait for the software to complete the qualification as a SAT. This decision saved as much as six weeks in the project schedule and enabled Catalent to meet the customer's timeline for stability and process-validation manufacturing. It also resulted in a formulation system that is part of a robust technical transfer process from the customer through the NPD group to Catalent's commercial manufacturing team.

Execution. To date, all of the engineering, stability, and process-validation batches have met the in-process and final-product test specifications. With nine batches produced, there have been no out-of-specification results for bulk or final product. In addition, no human error deviations have occurred in the formulation and filling of these batches.


Figure 2 (Catalent): A blow/fill/seal cavity fill machine at Catalent’s Woodstock, Illinois, facility.
Figures 1–3 (Catalent) show the facility upgrade and project equipment after installation.


Figure 3 (Catalent): A fully automated formulation skid at Catalent’s Woodstock, Illinois, facility.
In summary, Catalent did not employ new or groundbreaking methodology for this project. However, supplying the proper structure and resources for a project team is the crucial first step in meeting a customer's timeline and supplying the customer with quality product, reliably supplied.


ADVERTISEMENT

blog comments powered by Disqus
LCGC E-mail Newsletters

Subscribe: Click to learn more about the newsletter
| Weekly
| Monthly
|Monthly
| Weekly

Survey
What role should the US government play in the current Ebola outbreak?
Finance development of drugs to treat/prevent disease.
Oversee medical treatment of patients in the US.
Provide treatment for patients globally.
All of the above.
No government involvement in patient treatment or drug development.
Finance development of drugs to treat/prevent disease.
27%
Oversee medical treatment of patients in the US.
12%
Provide treatment for patients globally.
8%
All of the above.
46%
No government involvement in patient treatment or drug development.
7%
Jim Miller Outsourcing Outlook Jim MillerCMO Industry Thins Out
Cynthia Challener, PhD Ingredients Insider Cynthia ChallenerFluorination Remains Key Challenge in API Synthesis
Marilyn E. Morris Guest EditorialMarilyn E. MorrisBolstering Graduate Education and Research Programs
Jill Wechsler Regulatory Watch Jill Wechsler Biopharma Manufacturers Respond to Ebola Crisis
Sean Milmo European Regulatory WatchSean MilmoHarmonizing Marketing Approval of Generic Drugs in Europe
Seven Steps to Solving Tabletting and Tooling ProblemsStep 1: Clean
Legislators Urge Added Incentives for Ebola Drug Development
FDA Reorganization to Promote Drug Quality
FDA Readies Quality Metrics Measures
New FDA Team to Spur Modern Drug Manufacturing
Source: Pharmaceutical Technology,
Click here