Even when all is well at the facility, one must expect the worst while braving the elements.


Pharmaceutical Technology
Volume 36, Issue 11, pp. 16

Interruptible power supply

"We are connected to an uninterruptible power supply (UPS)," our GMP Agent-In-Place complained. "When the power went off on our lyophilizer, the UPS should have kicked in immediately. We had $1 million of product in the lyophilizer that was at risk, so the UPS was a good idea. However, on one occasion, the UPS failed to kick in, and as a result of the power outage, the lyophilizer compressors stopped cooling the shelves, and the shelves no longer met the cold temperature requirement. This happened after midnight on a Saturday, so we needed to notify mechanics and experts. It took nearly 13 hours to correct, so we had a deviation of major proportions. We soon replaced the UPS because the existing one was malfunctioning. The batch had to undergo significant laboratory and technical evaluation before being considered for release."

Lack of product stability

"We purchased product from another company," explained our GMP Agent-In-Place. "The product had a room temperature allowance within the usual refrigerated storage requirement. The idea is that the patient could store the product on their counter rather than in a refrigerator. The other company made a change to the stabilizer of the product and their stability studies seemed to show there was no change in product stability. Unfortunately, after we started distribution of the new formula, additional stability data showed the formula would not meet the room temperature allowance and we had to recall several batches. The reason for the delayed information was that the assay for the product was quite variable with a coefficient of variation of 7%. This variability hid the true stability for some time, and we paid the price."

Pharmaceutical Technology's monthly "Agent-in-Place" column distills true-life cautionary tales from the files of Control, a senior compliance officer. If you have a story to share, please email it to Control at

We won't use any names, but if we do use your experience in the column, you'll receive a Pharmaceutical Technology t-shirt.


ADVERTISEMENT

blog comments powered by Disqus
LCGC E-mail Newsletters

Subscribe: Click to learn more about the newsletter
| Weekly
| Monthly
|Monthly
| Weekly

Survey
Which of the following business challenge poses the greatest threat to your company?
Building a sustainable pipeline of products
Attracting a skilled workforce
Obtaining/maintaining adequate financing
Regulatory compliance
Building a sustainable pipeline of products
20%
Attracting a skilled workforce
28%
Obtaining/maintaining adequate financing
12%
Regulatory compliance
40%
View Results
Eric Langer Outsourcing Outlook Eric LangerBiopharma Outsourcing Activities Update
Cynthia Challener, PhD Ingredients Insider Cynthia Challener, PhDAppropriate Process Design Critical for Commercial Manufacture of Highly Potent APIs
Jill Wechsler Regulatory Watch Jill Wechsler FDA and Manufacturers Seek a More Secure Drug Supply Chain
Sean Milmo European Regulatory WatcchSean MilmoQuality by Design?Bridging the Gap between Concept and Implementation
Medicare Payment Data Raises Questions About Drug Costs
FDA Wants You!
A New Strategy to Tackle Antibiotic Resistance
Drug-Diagnostic Development Stymied by Payer Concerns
Obama Administration Halts Attack on Medicare Drug Plans
Source: Pharmaceutical Technology,
Click here