
PTSM: Pharmaceutical Technology Sourcing and Management
- PTSM: Pharmaceutical Technology Sourcing and Management-05-06-2015
- Volume 11
- Issue 5
IDT Biologika Vaccine Facility Recognized
IDT Biologika receives 2015 Facility of the Year Award or facility integration from ISPE.
IDT Biologika, a contract manufacturer of biopharmaceuticals and vaccines, has announced it is the recipient of the 2015 Facility of the Year Award (FOYA) for facility integration. The award, sponsored by the International Society for Pharmaceutical Engineering, spotlights companies that set the standard in pharmaceutical facility design, integration and operational excellence.
The company completed an expansion of its biologics and vaccines production facility in Germany in 2014, adding automated filling and freeze-drying operations for large-scale commercial manufacturing and increased quality of aseptic operations.
A manufacturer of human vaccines, IDT Biologika expanded vaccine production from two to three buildings and extended its capacities for large scale commercial production of new human vaccines. The company can manufacture up to 100 million vials per year of freeze-dried and liquid presentations.
An automated loading and unloading freeze-dryer system affords the company a key position for vaccine manufacturing services, the company reports in a press statement. Other features include a freeze-dryer shelf capacity of 40 m2, equal to at maximum 178,000 vials per batch, particle and microbiological tests, repeated camera inspections, 100% fill volume controls, vial coding and washing of capped vials.
A new isolator filling line can be expanded with two additional 40 m2 freeze-dryers for scaled-up commercial supply. The building concept allows the implementation of an additional filling line to effectively double manufacturing capacity upon request.
The International Society for Pharmaceutical Engineering will formally recognize IDT Biologika for facility integration along with winners in other categories during the Facility of the Year Awards Banquet, June 2, 2015, in Washington, D.C.
Source:
Articles in this issue
over 10 years ago
Better Control of the API Supply Chain?over 10 years ago
Big Pharma Feeds Big CMO Growthover 10 years ago
Capsugel Produces DPI Phase 2 Trial Suppliesover 10 years ago
Chinese API Manufacturer Warned for Data Integrity Issuesover 10 years ago
Mylan Recalls Injectables Due to Visible Particulate Matterover 10 years ago
FDA Releases Final Biosimilar Guidanceover 10 years ago
Vetter Serializes First Product for South Koreaover 10 years ago
SGS Completes Expansion at Mumbai Facilityover 10 years ago
Serialization: Deja Vu All Over Again?over 10 years ago
Gauging Change in Europe’s Sterile Manufacturing MarketNewsletter
Get the essential updates shaping the future of pharma manufacturing and compliance—subscribe today to Pharmaceutical Technology and never miss a breakthrough.





