Supplier Woes
Production sometimes follows the law of supply and reprimand.
Unapproval confession
"It was only sheerest chance that we discovered it at all," notes our GMP-Agent-in-Place. "It was in the late 1980s when we manufactured a timed-release bead in a capsule product that was manufactured with an active ingredient from a supplier that was not in the new drug application and therefore was not approved. We had sold several batches of the product.
"Once we discovered this, the new supplier was qualified, and a supplement to the new drug application was submitted and ultimately was approved by FDA. However, the batches made with the unapproved supplier were never recalled and were left on the market!
"You can bet that we reviewed every supplier we used against the new drug applications and issued a formal list of the approved suppliers and ingredients. We also instituted a check of the supplier and ingredient list as part of the material receipt process."
Eye feel your pain
"We had produced this ophthalmic preparation for a long time, and when one adverse event for 'burning sensation' came in, we thought nothing of it," admits our GMP Agent-in-Place. "But when similar reports of adverse events came pouring in, we nearly panicked. This was a well known, well-understood formulation, and we didn't understand what could be causing these reactions.
"Finally we decided to matrix all the ingredients used in all the recent batches, whether or not there were adverse events. This process led us to determine that the common factor was a plastic resin used for making the bottles of one product. Further investigation into the matter told us that the supplier had changed the colorant in the resin without notifying us. As a result, we recalled the affected product and trashed two months of production!"
Something's fishy here
"The problem was just ordinary salt—that's right, sodium chloride," relates our GMP-Agent-in-Place. "Production volumes had increased, and our purchasing department had fallen behind in the orders for the injectable-quality salt we needed. So they had five drums air-shipped in overnight for immediate use while the main shipment was being prepared. Problem solved, right?
"Wrong.
"When the salt was received and the drums were opened for sampling, one smelled fishy. Apparently the drums had seen previous use! While the laboratory testing all passed, the smell alone was enough to reject all the drums, and another overnight air-shipment was required. They always blame the quality department, but we didn't order our ingredients to be shipped in used drums. Production was shut down for 48 hours because of the lack of salt."
Pharmaceutical Technology's monthly "Agent-in-Place" column distills true-life cautionary tales from the secret files of Control, a senior compliance officer. If you have a story of clueless operators, oblivious management, inopportune lapses of judgment, or Murphy's Law in action, please send it to Control at 
Articles in this issue
about 18 years ago
Big Changes for USPabout 18 years ago
Dose Manufacturing Capacity Growing in Low-Cost Countriesabout 18 years ago
Ensuring Quality for Dietary Supplementsabout 18 years ago
A Moral Decision, A Vital Consequenceabout 18 years ago
Protecting the Cold Chainabout 18 years ago
In the Spotlight August 2007about 18 years ago
Paving Way for Pediatric Drug Safetyabout 18 years ago
Favorable Outlook for Generic APIsabout 18 years ago
All Routes Lead to EnhancementNewsletter
Get the essential updates shaping the future of pharma manufacturing and compliance—subscribe today to Pharmaceutical Technology and never miss a breakthrough.